27th July - Tuesday

Session: Scheduling
 11:00-12:30 Room TB5 - 3.1.05 Jorge Pinho de Sousa
  D. P. Ronconi
A Lower Bound on the Makespan for the Flowshop with Blocking
(TB5_1.pdf)
  M. C. Gomes, A. B. Póvoa, A. Q. Novais
An Optimal Reactive Scheduling Model for Job Shop, Make-to-Order Industries
(TB5_2.pdf)
  R. Alves, J. Valente
Beam Search Algorithms for the Early/Tardy Scheduling Problem
(TB5_3.pdf)
wide scope
Castelo de São Jorge
Torre de Belém
Lisboa
Ponte 25 de Abril
Eléctrico